Disaster Recovery Center (DRC) Guidelines

Type of Site to be Selected

  • State, local, tribal, or territorial (SLTT) government-owned buildings at no cost to the state/federal government
  • Commercial buildings (e.g., Community services buildings such as centers for independent living and other community services providers), at no cost to the state/federal government
  • Cannot be in a Flood Zone
  • Before proposed sites can be opened, they would need to be inspected by a State/FEMA team composed of representatives from Individual Assistance, Logistics, Safety, Security, Office of Equal Rights, and Information Technology.

Operational Timelines

  • The timeline for opening DRCs is typically 3 –5 days from the date of the declaration
  • DRCs may need to remain operational for up to 30 days or longer
  • The location’s owner must be willing to allow State/FEMA to install internet service, if necessary
  • Facilities should be available from 24/7, Monday through Saturday, and possibly on Sundays and holidays
  • Identify a facility Point of Contact who is available if needed 24/7 (as needed)
  • A minimum 48-hour notice must be given prior to closing

Location Amenities

  • Facility – should have a minimum of 1,500 sq ft
  • Have a physical address, including proper name, zip code, and latitude/longitude for  proper geocoding
  • Must have sufficient on-site parking (approximately 50 spaces or more) or provide public transportation by county from a staging area
  • Facilities should have heat, A/C, electricity, phone, good lighting, potable water, restrooms (paid for by City/Town)
  • Must be ADA compliant
  • ADA Compliant Restrooms
  • Consideration must be given to the most vulnerable population
  • Ground Floor Access
  • Trash cans/liners
  • Janitorial Services
  • Security (City/Town) provided for approximately 3 days, if needed or until FEMA can provide security)
  • Appropriate emergency fire and medical support should be quickly available to the location
  • DRC facilities should be centrally located in a community to minimize travel time when possible
  • Where applicable, DRCs should be established on a public transportation route
  • The parking lot should be able to temporarily accommodate a Mobile Communication Operation Vehicle (MCOV) (60’’ long x 20’’ wide), if necessary
  • If a Mobile Disaster Recovery Center (MDRC) is to be established, the location must be level, solid, have adequate drainage, and unobstructed view of the south-western sky for the satellite connectivity of the MCOV
  • Adequate space for a large tent, portable restrooms, and enough parking for survivors and staff
  • Determine if the occupancy of the facility has any Environmental Planning and Historic Preservation (EHP) considerations that need to be addressed (e.g., Special flood hazard area (SFHA), historical site, etc.)